Examples of disputes Jeff has handled include:
- Concurrency delay and construction management failures in site construction (4) (1MM to 1.5MM ea.);
- CPM-based claim and material design flaws on Southwest food-processing plant (2MM);
- Senior High School design and constructability claim (3) (1MM to 8MM);
- Pipeline projects (2), differing site conditions (2MM and 2.5 MM);
- Pipeline project, delay and hazardous material (EPA Superfund site) (5MM);
- Commercial Development water intrusion claims (5) private delay (1), total cost and constructability claims (2) (200K to 12MM).